Bathroom pod
Bathroom pod
Bathroom pod
Bathroom pod
Bathroom pod
Bathroom pod
Bathroom pod
Bathroom pod
Bathroom pod

    Bathroom pod

    EcoReadyBath Configurable BIM Model for Prefabricated Bathroom Pods

    The EcoReadyBath BIM model is a configurable planning object for the early design and coordination of prefabricated bathroom pods.

    It was developed for architects, BIM coordinators, MEP designers, and project teams who want to assess how a bathroom pod integrates into the building model before key spatial and technical interfaces are fixed.

    Rather than representing a single fixed bathroom layout, the model lets you adjust selected parameters to explore different pod configurations and project requirements.

    Configurable parameters include:

    • Shower tray: 800–1,500 mm, adjustable in 100 mm increments
    • Pod length: standard 2,400 mm, adjustable up to 3,500 mm
    • Service shaft: variable horizontal width
    • WC drainage position: adjustable within the defined connection zone
    • Door position: coordinated with required clearances around the shower and WC area
    • Pod floor build-up: approx. 90–150 mm
    • Internal clear height: from approx. 2,250 mm
    • Maximum transport height: approx. 2,840 mm
    • Selected accessories: shower mixer, basin mixer, shower caddy, toilet paper holder, toilet brush and mirror can be included or excluded from the model

    Use the model for early coordination

    The BIM object provides a practical starting point for checking:

    • pod dimensions and required installation space,
    • bathroom layout and room geometry,
    • service shaft positioning,
    • drainage and MEP interface zones,
    • structural and adjacent building interfaces,
    • floor and height build-ups,
    • door and sanitaryware positions,
    • repeated bathroom types within larger developments.

    For projects with multiple identical or similar bathrooms, early use of the model can also support type optimisation and standardisation before detailed design and series production.

    Prefabrication starts before production

    Bathroom pod dimensions, shafts, drainage, structural openings, MEP connections and installation requirements are closely interdependent. Coordinating these elements early helps project teams identify potential constraints while there is still flexibility to resolve them.

    The downloadable EcoReadyBath BIM model represents a configurable example solution for planning purposes. Final bathroom pods are developed specifically for each project and coordinated with its architectural, structural, MEP, accessibility, finish and installation requirements.

    Download the model, test the configuration and coordinate the critical interfaces early.

    Specifikation
    • General Description of Bathroom Pod Construction

      EcoReadyBath bathroom pods are based on a steel floor frame system and developed as project-specific prefabricated bathroom units.

      • The floor structure is formed on a steel frame.
      • Wall structures are made from cold-formed steel profiles mechanically connected with screws and bolts.
      • Wall cladding is selected to provide the required structural performance and suitability for lightweight steel-frame construction.
      • The ceiling construction consists of layered composite panels with a total thickness of approximately 24 mm.
      • Pod geometry is developed in accordance with project-specific requirements, applicable regulations and required clearances. Where relevant, accessibility requirements such as DIN 18040-1 and DIN 18040-2 can be taken into account.
      • Final pod weight depends on dimensions, structural build-up, finishes and sanitary equipment.

      For initial structural and BIM coordination, the following indicative planning loads may be assumed:

      • Bathroom pods up to 4 m²: approx. 330–350 kg/m²
      • Bathroom pods from 4 to 6 m²: approx. 250–300 kg/m²
      • Bathroom pods above 7 m²: approx. 180–250 kg/m²

      These values are intended for early-stage coordination only. Final module weight is confirmed during project-specific design development.

      Configurable BIM Model Parameters

      The EcoReadyBath BIM object allows selected geometric and equipment parameters to be adjusted for early planning and coordination.

      • Shower tray width: 800–1,500 mm, adjustable in 100 mm increments
      • WC drainage position: adjustable within a defined 200 mm range to the left or right
      • Pod length: standard 2,400 mm; maximum 3,500 mm
      • Service shaft: horizontal dimension adjustable
      • Door position: controlled in relation to required clearances around the shower and WC zone
      • Optional accessories: shower mixer, basin mixer, shower caddy, toilet paper holder, toilet brush and mirror can be switched on or off in the model
      • Pod floor build-up: approximately 90–150 mm
      • Internal clear height: minimum approximately 2,250 mm
      • Maximum transport height: approximately 2,840 mm

      The BIM model is intended as a configurable planning and coordination tool. Final bathroom pod dimensions, construction, interfaces and equipment are developed specifically for each project.

    Teknisk specifikation
    • Unik ref.Bathroom-pod
    • TypeObjekt (enkelt objekt)
    • Udgivelsesdato2023-09-08
    • Udgavenummer1
    • Højde (mm)2840
    • Bredde (mm)2400
    Relateret
    • Materiale primærtStål
    • Designet iPolen
    • Fremstillet iPolen
    Klassifikation
    • BIMobject-kategoriKonstruktion - Modular Space
    • IFC-klassifikationByggekomponent
    • Uniclass 2015-kodeSs_20_10_60
    • Uniclass 2015-beskrivelsePrefabricated framed and panelled structures
    • CSI MasterFormat 2014-kode13 42 13
    • CSI MasterFormat 2014-titelBathroom Unit Modules
    • OmniClass-nummer23-19 31 17 11
    • OmniClass-betegnelseBathroom Units

    Tilgængelighed i region

    Europa Asien Nordamerika Afrika Sydamerika Oceanien
    Åland
    Afghanistan
    Anguilla
    Ækvatorial Guinea
    Argentina
    Amerikansk Samoa
    Albanien
    Armenien
    Antigua og Barbuda
    Algeriet
    Bolivia
    Australien
    Andorra
    Aserbajdsjan
    Aruba
    Angola
    Brasilien
    Cook-øerne
    Belgien
    Bahrain
    Bahamas
    Benin
    Chile
    Fiji
    Bosnien-Herzegovina
    Bangladesh
    Barbados
    Botswana
    Colombia
    Fransk Polynesien
    Bulgarien
    Bhutan
    Belize
    Burkina Faso
    Ecuador
    Guam
    Cypern
    Brunei Darussalam
    Bermuda
    Burundi
    Falkland-øerne (Islas Malvinas)
    Kiribati
    Danmark
    Cambodia
    Canada
    Cameroon
    Fransk Guiana
    Marshall-øerne
    Estland
    Cocosøerne
    Caribbean Netherlands
    Cape Verde
    Guyana
    Mikronesien
    Færøerne
    Det britiske territorium i Det Indiske Ocean
    Caymanøerne
    Chad
    Paraguay
    Nauru
    Finland
    Filippinerne
    Costa Rica
    Comoros
    Peru
    New Zealand
    Frankrig
    Forenede Arabiske Emirater
    Cuba
    Congo
    Suriname
    Niue
    Gibraltar
    Georgien
    Curaçao
    Den centralafrikanske republik
    Uruguay
    Nordmarianerne
    Grækenland
    Hong Kong
    De britiske jomfruøer
    Den demokratiske republik Congo
    Venezuela
    Norfolk
    Guernsey
    Indien
    Dominica
    Djibouti
    Ny Kaledonien
    Holland
    Indonesien
    Dominikanske Republik
    Egypten
    Palau
    Hviderusland
    Irak
    El Salvador
    Elfenbenskysten
    Papua Ny Guinea
    Irland
    Iran
    Grenada
    Eritrea
    Pitcairn-øerne
    Island
    Israel
    Grønland
    Eswatini
    Samoa
    Isle of Man
    Japan
    Guadeloupe
    Etiopien
    Solomon-øerne
    Italien
    Jordan
    Guatemala
    Gabon
    Timor-Leste
    Jan Mayen
    Juleøerne
    Haiti
    Gambia
    Tokelau
    Jersey
    Kazakhstan
    Honduras
    Ghana
    Tonga
    Kroatien
    Kina
    Jamaica
    Guinea
    Tuvalu
    Letland
    Kuwait
    Jomfruøerne
    Guinea-Bissau
    United States Minor Outlying Islands
    Liechtenstein
    Kyrgyzstan
    Martinique
    Kenya
    Vanuatu
    Litauen
    Laos
    Mexico
    Lesotho
    Wallis og Futuna
    Luxembourg
    Libanon
    Montserrat
    Liberia
    Malta
    Macau
    Nicaragua
    Libyen
    Moldova
    Malaysia
    Panama
    Madagascar
    Monaco
    Maldiverne
    Puerto Rico
    Malawi
    Montenegro
    Mongoliet
    Saint Kitts og Nevis
    Mali
    Nordmakedonien
    Myanmar (Burma)
    Saint Lucia
    Marokko
    Norge
    Nepal
    Saint Pierre og Miquelon
    Mauritania
    Østrig
    Nordkorea
    Saint Vincent og Grenadinerne
    Mauritius
    Polen
    Oman
    Saint-Barthélemy
    Mayotte
    Portugal
    Pakistan
    Saint-Martin
    Mozambique
    Rumænien
    Palæstina
    Sint Maarten
    Namibia
    Rusland
    Qatar
    Trinidad og Tobago
    Niger
    San Marino
    Saudiarabien
    Turks- og Caicosøerne
    Nigeria
    Schweiz
    Singapore
    USA
    Reunion
    Serbien
    Sri Lanka
    Rwanda
    Slovakiet
    Sydkorea
    Sankt Helena
    Slovenien
    Syrien
    São Tomé og Príncipe
    Spanien
    Taiwan
    Senegal
    Storbritannien
    Tajikistan
    Seychellerne
    Sverige
    Thailand
    Sierra Leone
    Tjekkiet
    Turkmenistan
    Somalia
    Tyskland
    Tyrkiet
    Sudan
    Ukraine
    Uzbekistan
    Sydafrika
    Ungarn
    Vietnam
    Sydsudan
    Vatikanstaten
    Yemen
    Tanzania
    Togo
    Tunesien
    Uganda
    Vestsahara
    Zambia
    Zimbabwe
    BIMobject-produktbibliotek

    Design App til Revit

    Indlæs familier direkte ind i din Revit-model med ét klik

    Få et sted til at få adgang til nye objekter nemmere, opbevar dine Revit-familier og samarbejd med dit team.

    • MarkeringArbejd direkte med BIM-objekter ved siden af Revit
    • Markering 2 GB cloudlager – gem dit Revit-indhold
    • Markering Få integreret CO2-LCA (A1-A3) direkte fra Revit