한 번의 클릭으로 Revit 모델에 바로 패밀리를 로드하세요.
새 객체에 더 쉽게 접근하고, Revit 패밀리를 저장하고, 팀과 협업할 수 있는 공간을 확보하세요.
Revit 바로 옆에서 BIM 개체로 직접 작업
2GB 클라우드 스토리지 - Revit 콘텐츠 저장
Revit에서 바로 내재 탄소 LCA(A1-A3) 획득
For the production of quickly usable and ready to lay mineral decorative floors and screeds on insulation layer, on separating layer and in combination.
Dimension-controlled binder system = almost shrinkage and stress-free hardening and drying.
Quick usability.
Suitable for indoors and outdoors, but only as an undercoat in outdoor areas.
Can be walked on after 8 to 12 hours.
Sandable after 36 to 48 hours, depending on temperature.
Processing time 60 minutes
Consistent consistency even with longer mixing times and long conveying distances
Easy distribution and application of the mortar
Range of application
Production of sanded decorative floors and screeds with quick accessibility and early initial strength
In cooperation
On separate layer
As floating screed
지역 가용성
| 유럽 | 아시아 |
|---|---|
독일 | 싱가포르 |
러시아 | 태국 |
아일랜드 | 터키 |
영국 | |
오스트리아 | |
체코 공화국 | |
폴란드 | |
프랑스 |

Revit용 Design App
한 번의 클릭으로 Revit 모델에 바로 패밀리를 로드하세요.
새 객체에 더 쉽게 접근하고, Revit 패밀리를 저장하고, 팀과 협업할 수 있는 공간을 확보하세요.