ELEMENTS FOR THE SPECIFICATION DESCRIPTION
Supply of recycled polypropylene formwork measuring 50x50 cm in plan and with height as per project specifications, with dry resistance of 150 kg (D.L.7.2.4 09/01/1996), called TOP 4S, including cuts, waste, and any additional processing for system installations.
Dry installation of the formwork on a previously prepared flat substrate.
Supply and installation of electro-welded mesh Ø 6 mm with 20x20 cm grid, including overlaps and waste, placed directly above the formwork.
Supply and pouring of concrete Rck = 250 kg/cm² to fill the formwork flush and create the upper slab with adequate thickness.