Mixing ratio: 10 parts of component A (resin) to 1 part of component B (hardener)
Specific Weight: Component A = approx. 1,0 kg / l
Component B = approx. 1.2 kg / l
Consumption: First coat: approx. 80 gr.
Second layer: approx. 80 gr.
Operating time: (+20 ° C): approx. 45 minutes
Application of the following coat on the first: (+20 ° C): after about 2-4 hours
Readiness for pedestrian loads: (+20 ° C): after about 24 hours
Fully hardens: (+20 ° C): after about 7 days
GHS / CLP designations: Component A: none Component B: GHS07 ”Warning“ Signal word: Warning
Designation according to GGVSEB / ADR: (components A and B) no
EMICODE: EC1R PLUS - Extremely low emission PLUS
Note: Actual material consumption depends on the base and accuracy of work.
Packaging: Component A: 3.0 kg canister Component B: 0.3 kg bottle
Storage: PANDOMO® SP-PS is stored in dry rooms in closed original packaging at temperatures from +5 ° C to +30 ° C for at least 6 months. The product must be protected from frost, sunlight and heat sources.