Product description
Solvent- and water-free two-component epoxy resin system
For the production of fast-usable epoxy resin screeds on insulating layer, on separating layer and in combination in new buildings, old buildings and renovations
Ready for occupancy after 1 day
Low screed thicknesses possible
High compressive and bending tensile strengths
Easy processing
pumpable
Application
Mixed with ARDEX SPS special sand for the production of epoxy resin screeds in composite, on separating layer and on insulating layer.
In new buildings and especially in old buildings, renovations and renovations, eg on old wooden floorboards, and for the repair of old screeds of cement and calcium sulphate.
ARDEX EP 25 epoxy resin screeds can be walked on after just 12 hours and can be laid after 24 hours. For the execution of screeds the general guidelines and standards, DIN 18560 and DIN 18353 apply, unless otherwise stated in this data sheet.
For the interior.