This is a combined example of the edilon)(sedra LCS-400 ADIF precast concrete slab with an edilon)(sedra Corkelast® ERS (Embedded Rail System). In this case an ERS HR 54E1-SS 1:20 142-149 is shown as the rail system.
This configuration is represented in the model with two slabs of 4 m length each, which are arranged sequentially. In its channels, the ERS system previously mentioned is installed. The joint sealant between the slabs is not represented, as it will be defined according to the specific project requirements.
Region availability
| Europe |
|---|
Spain |